martes, 25 de enero de 2011
Service Provided to M/T Kingston 2010
M/T Kingston.-
Diesel Generator: Maker/Type: MWM/TBD 604L6-(3) sets (570 BHP at 1500 RPM, 400 Kw, T/C KKK K42.
General overhauling of D/Gs No. 3 (spares owner's supplied) included:
a) Open-up cylinder heads and withdraw pistons. Cleaning and calibrate cylinder liners and check mating surface between liner and head. Cleaning and calibrate piston rings/grooves, piston rod and renew piston rings, re-assemble in good order.
b) In addition to a) withdraw and refit cylinder liner including cleaning of jacket and renewal of sealing rings
c) Crankpin bearings: Open-up for survey. Clean, inspect, take/report clearances and close in good order.
d) Main Bearings: Open-up for survey. Clean, inspect, take/report clearances and close in good order.
e) Inspected fuel pump from position.
f) Remove following valves and transport ashore to workshop. At workshop dismantle/chemical clean and check all parts. Re-assemble the valves.
f-a) Exhaust Valve.
f-b) Inlet Valve.
f-c) Fuel Valve.
f-d) Starting Valve.
f-e) Safety Valve.
General overhauling and crankshaft Repair of D/G No1 and No 2 : (spares owner's supplied) included:
a) Open-up cylinder head and withdraw piston. Cleaning and calibrate cylinder liner and check mating surface between liner and head. Cleaning and calibrate piston rings/grooves, piston rod and renew piston rings, re-assemble in good order.
b) In addition to a) withdraw and refit cylinder liner including cleaning of jacket and renewal of sealing rings
c) Crankpin bearings: Open-up for survey. Clean, inspect, take/report clearances and close in good order.
d) Main Bearings: Open-up for survey. Clean, inspect, take/report clearances and close in good order.
e) Inspected fuel pumps from position.
f) Remove following valves and transport ashore to workshop. At workshop dismantle/chemical clean and check all parts. Re-assemble the valves.
f-a) Exhaust Valve.
f-b) Inlet Valve.
f-c) Fuel Valve.
f-d) Starting Valve.
f-e) Safety Valve.
Removed/refitted back of crankshaft for machining of "Crankshaft Crankpin Big End Journal No6 on DG #1 and Crankpin Big End Journal No 2 on DG # 2.
- ONLY" (according makers stages) Stage # 2.
Mechanized the six (6) cylinder heads of Diesel generator # 2.
Were dismantled, installed and repaired the cooling water and main lube oil pump of auxiliary generator # 1.
Suscribirse a:
Enviar comentarios (Atom)
No hay comentarios:
Publicar un comentario