Service Provided to M/V Acapulco 2011.

M/V Acapulco
Description
MAIN ENGINE: MAN 6L50MC ; Maker: Cegielski
Provided three Technicians for Mechanical Assistances in ship bottom valves maintenance from may.26 to june 01-2011.
"8.08 Turbo Charger Air Cooler Cleaned:
Maker: B&H EXHANGERS LTD FOR CEGIELSKI B&W 6L50MC Hydrostatic tested pressure (for tube side) - 4 bar Hydrostatic test pressure (for air side) - 2 bar Weight: EndCover-317kg Cooler element LKM27D4 - 1033 kg Waterflow reversing chamber - 214 kg
The charge air cooler is of block type and located at the engines starboard side, below the turbo charger. The unit, which is welded up on steel plates, is of considerable weight see above. InServ disconnected the LT Fresh water inlet- and outlet lines and all associated piping, removed the cooler from the present location and transported the unit ashore for chemical cleaning of the airside and hydro test of the fresh waterside.
Upon completion of the cleaning process, the cooler was shown to the Owner's Representative for final inspection. InServ arranged for the charge air cooler to be transported back to the vessel and reinstalled, InServ Supplied new gaskets, seals and replacing some defective bolts and nuts. During the transportation, adequate measures was taken to protect the cooler fíns from any damage."
Charge air cooler additional Repair: during workshop charge air cooler maintenance were found three leaking tubes, all the tubes were tested one by one until found the bursted tubes, these were plugged with bronze plugs.
Auxiliary Boiler: Were Mechanically cleaned the Exhaust gas and water sides.
8.11 Main Engine Exhaust Gas Manifold: Replaced defective Isolating materials aprox. 12m2, Supplied isolating materials and installed.

Service Provided to M/T Zhen Zhu Wan 2011.






Mechanical Work.
M/T Zhen Zhu Wan
Description
Main engine maker:WARTSILA power:4000 KW rpm:750 r/min.
M-101 M/E crankshaft deflection were measured before & after repair, Recorded in copies submitted to ship.
M-102 NO.3 and NO.9 main bearings were removed, were reinstalled the same bearings as per ship representative decision. Journals was inspected and cleaned, Bearings were Refitted in Presence of C/E and surveyor.
"M-103 TPL69-A30 ABB Turbo.Systems Ltc.
M/E turbocharger. Type: TPL69-A30 . Maker:ABB Turbo.Systems Ltc.
Cartridge Was removed , cleaned, examined, clearance and measured were taken, Nozzle and cover ring were ash blasting and mechanically cleaned, spares were supplied by ship. Turbocharger's Cartridge and compounds were refitted back."
"M-201 EGH700V40 ,1.15 Mpa
Vertical economizer, type: EGH700V40,
designed pressure 1.0Mpa, access door were opened, Exh.gas side was mechanically and water-cleaned, T.O pipe was pressure tested up to 1.15 Mpa for survey, Gasket was renewed and refitted."
"M-202 1.0 Mpa,8 Mpa,
1 sets of T.O safety valve for economizer was removed and sent to valveshop, Cleaned and faced up, Open/ close pressure tested and readjusted to 1.0/0.8 Mpa for survey."
"M-203 TOH1150V50 , 1.0 Mpa,1.15 Mpa .
Vertical Aux.T.O boiler, 2 sets of boilers, type: TOH1150V50, designed pressure 1.0 Mpa.
No.1&No2 burner were pull out and the top covers were lift away , furnace were examined, The soot and carbon residue on the surface of the coils were removed away. Fire resistant material were inspected to see if there were any flakes. any damaged was found, fire sides were mechanically cleaned. T.O pipe were pressure tested up to 1.15 Mpa for survey. Gaskets Of burners seats were renewed when refitted."
M-204 1.0 Mpa,0.8 Mpa, 2 sets of T.O safety valves for Aux.T.O boiler were removed and sent to valveshop, Cleaned and faced up, open, close, pressure tested and readjusted to 1.0/0.8 Mpa for survey.

miércoles, 30 de noviembre de 2011

Service Provided to Power Barge Estrella del norte 2011






Description
Scope:
1. Were Dismantled, cleaning and assembled the seven (7) Lube Oil seperators.
2. Were Dismantled, cleaning and assembled the Three (3) HFO Separators.
3. Were Dismantled and cleaning the seven (7) lube oil filter units of main engines. Still pending for install the new cartridges!
4. Were Dismantled and cleaning the seven (7) HFO filter units of main engines. Still pending for install the new cartridges!
5. Were Dismantled, cleaned and reassembled the fourteen (14) Glasier lube oil filters of main engines.

jueves, 1 de septiembre de 2011

Service Provided to M/V Palencia 2011






Description
"1. MAIN ENGINE
MAKER : MAK 8M43.
TYPE : 8L43."
Boca chica port: evaluation of proccedures of M.E. crankshaft block lifting of on date May 19.2011.
Dismantled Main Engine Cranckshaft.

Service Provided to Cargo Barge MSRC/2011

Complete a Standard Major tune of to Services Generators and cargo pumps engines.
Barge MSRC.

Description
Done a complete standard Major tune of Engines Detroit Diesel 12V- 71: included change crankcase oil and filters, adjust the fuel racks, Checked the proper funtion of fuel system, renewed fuel filters and service air filters. Tested run engine after completation of service.
Done a complete standard Major tune of Engines Detroit Diesel 6-71: included change crankcase oil and filters, adjust the fuel racks, Checked the proper funtion of fuel system, renewed fuel filters and service air filters. Tested run engine after completation of service.
Done a complete standard Major tune of Engines Detroit Diesel 3-71: included change crankcase oil and filters, adjust the fuel racks, Checked the proper funtion of fuel system, renewed fuel filters and service air filters. Tested run engine after completation of service.
Supplied 4 Air filters, 2 lube oil filters and 4 fuel filters for the two Engines Detroit Diesel 6-71.
Supplied 2 Air filters, 2 lube oil filters and 4 fuel filters for the two Engines Detroit Diesel 3-71.
Supplied 2 Air filters, 4 lube oil filters and 4 fuel filters for the two Engines Detroit Diesel 12V-71.
Supplied 14 ventilator belts and 2 alternator belts for the two Engines Detroit Diesel 3-71, 6-71 and 12V -71.
Supplied 8 drums of lube oil SAE 40 of 5 galons each one for two Engines Detroit Diesel 3-71, 6-71 and 12V -71.
Generator # 4 (Detroit 6-71): Removed radiator ashore work shop for repair water leakage, supply coolant and refitted back to engine.

Service Provided to M/V Asian Moon 2011







Overhaul Activities executed on Main Engine MAN B&W 7L58/64. M/V Asian Moon
Description

Taken Crankshaft Deflection: Main engine crankshaft deflections were taken while the vessel is afloat prior to dry-docking. A second set of deflections was taken at the end of the repair period with the vessel afloat. All readings were recorded and submitted to the attending Owner’s superintendent.
11.2. Main Engine Charge Air Cooler: Was done by: InServ
Were dismantled all pipes, top cover and replace and builts the respectives gaskets. Refitted back the cover and pipes to air cooler with new gaskets.
11.3. Main Engine Overhaul: Was done by: InServ. Supervised by: Owners Contractors. The Main Engine was overhauled due running hours basis under the supervision of Manufacturers representative. All spare parts were owners supplied.
a) Were removed rocker arm covers, rocker arms, cylinder cover and piston. Cylinder cover were cleaned and overhauled according to manufacturer’s instructions, including all valves being overhauled and seats being lapped in as required. Pistons were dismantled and cleaned. Cylinder liners were honed using ships honing machine. All measurements were record and presented to owner’s representative. On completion all parts were reassembled with new spare parts as required and refitted. All clearances were adjusted as per manufactures recommendations.
b) Were withdrawed, cleaned and refitted with new seal rings each cylinder liners. Included cleaning as required of water spaces.
c) Was removed, inspected and refitted of one set of connecting rod bearing shells (# 2). Based on condition of bearing shells these were renewed rather than refitted.
d) Cost for the removal, inspection and refitting of one set main bearing shells: Based on condition of bearing shells these may be renewed rather than refitted. Canceled!
f) Cost open up and inspect one set of camshaft bearing shells and refit or renew dependent upon condition. Were inspected the 7 camshaft pieces running surface these look in good conditions.
g) Main Engine Vibration damper renewed. The Main Engine Vibration damper was replaced due running hours basic under the supervision of Manufacturers representative. This job included, pipe removal, pumps, strays, covers and cutting supports.
The vessel is fitted with a MAN NA48 turbocharger which was overhauled.
Upon dismantling, the rotor assembly was removed ashore for ash blasting and dynamic balancing and balancing report submitted to owner’s representative prior to reinstallation with owners supplied spare parts.
Nozzle ring and Locking ring of MAN NA48 turbocharger were ash blasting cleaned at Turboshop.
Inspected Main Engine Gear box under the supervision of Manufacturers representative.

Service Provided to M/V Viking Princess 2011





Description
HITACHI B&W 6L42MC.
"• Was removed a piece of broken stud-bolt On ME cylinder No.4 one of eight stud-bolts for clumping cylinder cover.
• Was cleaned around block treaded.
• Was installed and tighten a new spare stud-bolt available onboard."

Service Provide to M/V Coniston 2011






Description
Tested, calibrated and certificated a set of 21 Safety valves as follow:
1) 6 pcs- High Pressure Valves: Opening Pressure 18 Bar, Cargo Tank # 1,2,3. . 2) 6 pcs- Low Pressure Valves: Opening Pressure 7 Bar, Cargo Tank # 1,2,3. 3) 1 pc- Safety valve from cargo heater: opening pressure 20 Bar. 4) 2 pcs- Safety valves from dicharge's air compressors: opening pressure 20 Bar. 5) 3 pcs- Services valves of cargo (Manifold): opening pressure 20 Bar. 6) 1 pc Flash tank: opening pressure 20 Bar. 7) 2 pcs Air-Steam valves: Opening pressure 7 bar.

Service Provided to M/V Merwe Trader 2011






Description
1. MAIN ENGINE
MAKER : MAN B&W
TYPE : 8L48/60B
1.1 Crankshaft deflection: Was taken while the vessel was afloat prior to dry-docking. A second set of deflections was taken at the end of the repair period with the vessel afloat.
2.- Boiler SAACKE
2.1 Cleaned exhaust side of Heat recovery boiler.
2.2 Auxiliary Boiler furnace was cleaned.
Replaced Auxiliary Generator # 1, NDE Bearing.
Installed new line of electrical cable from Main Engine shaft alternator to control room panel.

Service Provide to M/V Maas Trader 2011


Description
1. MAIN ENGINE
MAKER : MAN B&W
TYPE : 8L48/60B
1.1 Crankshaft deflection: Was taken while the vessel was afloat prior to dry-docking. A second set of deflections was taken at the end of the repair period with the vessel afloat.
2.- Boiler SAACKE
2.1 Cleaned exhaust side of Heat recovery boiler.

domingo, 3 de julio de 2011

Service Provided to M/V Cap Canaille 2011







Description
"M.E.# 1 ME PORT SIDE
Maker: MAK Type: 9M 453 AT 3300HP at 600 RPM"
1.0 Crankshaft deflection: were taken before and after dry-docking.
"M.E.1.5 Turbocharger (T/C) Overhaul
Turbo charger Type: BBC VTR 321, dismantled for "" Complete overhaul "" Cartridge ash blasting Cleaned, painted and Dynamic Balanced.
"" Gear pumps checked "" Bearing exchanged. T/C was Assembled and reffited back to engine."
Adittional repairing and Grinding: were done in all defective turbine blades of turbo charger VTR 321 of M.E. # 1 Port side.
"M.E. # 2 ME STBD SIDE:
2.0 Crankshaft deflection: were taken before and after dry-docking."
"Auxiliary Engine # 1: Machined and Grinded of Four (4) Cylinder heads valves and seats
8 inlet valves.
8 exhaust valves.
8 inlet seats.
8 exhaust seats."
"ER1 Auxiliary Engine # 1 TC (turbo charger):
Dismantled, Cleaned, Inspected, Replaced bearings and seals, painted, Dynamic Balance done, reassembled and refitted back to engine."
"ER2 Auxiliary Engine # 2 TC (turbo charger):
Dismantled, Cleaned, Inspected, Replaced bearings and seals, painted, Dynamic Balance done, reassembled and refitted back to engine."
"ER3 Auxiliary Engine # 3 TC (turbo charger):
Dismantled, Cleaned, Inspected, Replaced bearings and seals, painted, Dynamic Balance done, reassembled and refitted back to engine."
"ER. 4 MAIN AIR RECEIVER (Upper)
dismantled the head, overhauled the valves head block, painted, reassembled, refitted back to receiver and pressure tested to 30.5 Bar."
"ER.5 MAIN AIR RECEIVER (lower):
dismantled the head, overhauled the valves head block, painted, reassembled, refitted back to receiver and pressure tested to 29.5 Bar."
"ER.6 EMC' y or AE STARTING AIR RECEIVER:
dismantled the head, overhauled the valves head block, painted, reassembled, refitted back to receiver and pressure tested to 28.5 Bar."
Repaired auxiliary generator #1,2 and 3 charge air coolers holders.
Repair one additional valve in: ER. 4 MAIN AIR RECEIVER (Upper), ER.5 MAIN AIR RECEIVER (lower), ER.6 EMC' y or AE STARTING AIR RECEIVER.
Auxiliary Engine # 3: Mechanized and Grinded of Four (4) Cylinder heads valves and seats: 8 inlet valves; 8 exhaust valves; 8 inlet seats; 8 exhaust seats. M.E. Cylinder head on Spare: Mechanized for install two exhaust seats, also Mechanized and Grinded the valves and seats.

Service Provided to M/V Melfi Cristobal 2011





Description
1.- Boiler SAACKE
1.1 Cleaned exhaust side of boiler (Smoke Side).
1.2 Cleaned of Water side of boiler.
"2. MAIN ENGINE
MAKER : MAN B&W
TYPE : 8L48B"
2.1 Crankshaft deflection: Was taken while the vessel was afloat prior to dry-docking. A second set of deflections was taken at the end of the repair period with the vessel afloat.

lunes, 28 de febrero de 2011

Service Provided to M/T SICHEM ONOMICHI 2011







Auxiliary Boiler Valves Overhaul.-
M/T SICHEM ONOMICHI
Description
Auxiliary Boiler Valves Overhaul: The following valves were Dismounted and Dismantled for overhaul, cleaned, lapped, gasket and gland packing changed, refitted back to boiler and pressure tested.
Main Steam stop valve: 10K-150 straight globe valve.
Circulating water pump 's inlet valve: 10K-65 straight globe valve
Circulating water pump 's outlet valve: 10K-65 straight globe valve.
Feed water Inlet valve: 10K-50 Straight globe valve
Bottom blow down valve: 16K-40 Straight globe valve
Overhauled of Main Steam Stop Valves: Deck main steam line valve (In HPPE) was Dismounted and Dismantled for overhaul, cleaned, lapped, gasket and gland packing changed, refitted back to boiler and pressure test. Spec. size-10K-150A Straight globe.

Service Provided to M/V Maas Trader 2011






Main Engine, Auxiliary Generator and Boiler Maintenance.
M/V Maas Trader


Description
1. MAIN ENGINE
MAKER : MAN B&W
TYPE : 8L48/60B
1.1 Crankshaft deflection: Was taken while the vessel was afloat prior to dry-docking. A second set of deflections was taken at the end of the repair period with the vessel afloat.
2.- Boiler SAACKE
2.1 Cleaned exhaust side of Heat recovery boiler.

Services Provided to M/V Merwe Trader 2011








Main Engine, Auxiliary Generator and Boiler Maintenance.
M/V Merwe Trader


Description
1. MAIN ENGINE
MAKER : MAN B&W
TYPE : 8L48/60B
1.1 Crankshaft deflection: Was taken while the vessel was afloat prior to dry-docking. A second set of deflections was taken at the end of the repair period with the vessel afloat.
2.- Boiler SAACKE
2.1 Cleaned exhaust side of Heat recovery boiler.
2.2 Auxiliary Boiler furnace was cleaned.
Replaced Auxiliary Generator # 1, NDE Bearing.
Installed new line of electrical cable from Main Engine shaft alternator to control room panel.